And now for something completely different


 
I love their Mission pic, lol. And then I noticed the mission statement was well-written and had perfect grammar (as far as I know); that stood out to me for some crazy reason.
 
I noted the banner across the top of TMG Pits page stating: "Current Estimated Lead Time Is 40-50 Weeks On All Pits (Except Volunteer, Roll Off, Dumpster, & Tank Offsets)" - so it you wanted one, there may be a bit of a wait.
 
My monster weighs around 1,200 lbs (will hold more than 30 lbs. of charcoal,) with 5" semi-pneumatic casters. Off concrete or other hard surfaces, it sinks like a rock. Those large wheels will make movement on grass possible.
 

 

Back
Top