I was planning on doing a side by side comparison of some Costco spares tomorrow and was wondering if my times seem right.
These usually take me about 7-8 hours unfoiled, so I was planning on throwing the first one on, and then 2 hours later putting the second slab on. I was going to let this one going for about 4 hours, foil for 1 hour, and return unfoiled for a final hour.
Never foiled spares before, does the 4-1-1 plan sound like it would be a good test?
These usually take me about 7-8 hours unfoiled, so I was planning on throwing the first one on, and then 2 hours later putting the second slab on. I was going to let this one going for about 4 hours, foil for 1 hour, and return unfoiled for a final hour.
Never foiled spares before, does the 4-1-1 plan sound like it would be a good test?